Our Vision
A world where housing and infrastructure are affordable and sustainable
News
Just in time for Christmas, some colleagues at PMM in Aichtal have dedicated themselves to a task close to their hearts in their free time.
Milestone in Putzmeister's history: major order for the NEOM project
At KARLOS 3D, we are excited to share the successful completion of a construction project in Remmeltshofen
Success Stories
In December 2008, a devastating environmental disaster occurred in Kinston, Tennessee.
The dam of a reservoir, which for years absorbed ash from the local coal-fired power station, ruptured under the load. Millions of cubic metres of black sludge poured over the region like a tidal wave, destroying houses and turning once-thriving local rivers into dead zones for fish.
This shocking event drew attention to the dangers of storing ash with a high water content and sparked an urgent discussion about safety and environmental protection.
Tratolixo, Portugal’s largest waste management company, already had two Putzmeister lines and is now adding a third to increase production and as a back-up option.
Compañía Minera Santa Luisa mechanises shotcrete thickness control with Geokret 2.0, Putzmeister's system based on scanning the sprayed surface, significantly improving the process
Products
Insight into the production of concrete pumps
at Putzmeister in Aichtal
Production of mortar machines and screed conveyors at
Putzmeister Mörtelmaschinen in Aichtal